PROFILEmiami South Florida Real Estate and Lifestyle

View Original

Rene Gonzalez Architects-Designed Surf Row Residences Beachside Homes Revealed In Surfside

Linéaire Group has revealed Surf Row Residences, a collection of eight private beach homes set to rise in Surfside. Inspired by Surfside’s rich heritage and natural beauty, Surf Row Residences aims to introduce the next level of urban beach living. Envisioned by award-winning architectural firm Rene Gonzalez Architects (RGA), known for their site-specific design and architecture, the ultra-luxury residential development is set to become a landmark synonymous with contemporary living and quiet prestige in Surfside.

The residences will be a modern interpretation of the brownstone tradition, reimagined for South Florida. With careful consideration for the surrounding environment, the development maximizes the use of natural light and local materials to distill an ingrained sense of place, paying homage to its history, neighbors, and landscape.

Developed by Linéaire Group, in partnership with ONE Sotheby's International, the project offers a different combination of living spanning two-story three- or four-bedroom floor plans and three-story four- or five-bedroom floor plans with between 3,500 - 5,600 SF of indoor space. In addition, the homes will have more than 2,000 SF of private outdoor living space, including a rooftop with a plunge pool, a summer kitchen, and an expansive veranda. There will also be two and three-car private garages and an enclosed front patio and garden further mirroring the single-family living experience.

Owners will have access to quintessential luxuries, such as an office space, library, meditation and exercise room, humidity-controlled garage, and private elevators. The project is also in talks with a few potential partners to offer a private beach club and property concierge services.

Only a few residences have been released for sale with pricing starting at $5.9 million. The project is slated to break ground in Q2 2023 with completion scheduled for Q4 2024.